Links

Conferences
"ITER Newsline" n'est pas disponible en français.
Pour lire les nouvelles en français, veuillez consulter "Les Actualités d'ITER", disponible ici...
Preparations are ongoing
-Taiger Murphy, Civil Engineering Technician
<< return to Newsline #145
Construction update

The concrete foundation for the Poloidal Field Coil Winding Facility is being put in place. © AIF (Click to view larger version...)
The concrete foundation for the Poloidal Field Coil Winding Facility is being put in place. © AIF
This week, the permanent buried cable for communications is being installed between the Technical Building B07 and the Contractor's Area No. 1. The rock blasting and excavation is continuing in the area of the future Tokamak Complex. The column footing installation, the concrete column reinforcement and the cast-in-place concrete placement for the Poloidal Field Coils fabrication building is continuing for the above-ground structure. Preparations for the foundation work are underway for the future permanent ITER Headquarters buildings.



<< return to Newsline #145