
The participants of the fifth ITER RAMI & Standardization Board Meeting.
RAMI stands for Reliability, Availability, Maintainability and Inspectability. It describes a process whose primary purpose is to make sure that all the systems of the ITER machine will be reliable during the operation phase and maintain their performance under operational conditions with the best possible availability. Failure of only one small function might result in the machine being halted for long periods of time and result in high costs for repairs and replacements. It is therefore important that every system undergoes a technical risk analysis to evaluate WHAT can go wrong, WHERE and WHEN, and to recommend spare components, back-up systems, increased frequency maintenance schedules, component standardization, systems design optimization etc, to reduce the risk level of a main function breakdown to a minimum and to decrease the time to repair to a maximum.