Subscribe options

Select your newsletters:

Please enter your email address:

@

News & Media

Latest ITER Newsline

  • In-vessel electrical systems | What it takes to wire up a fusion reactor

    While the challenges of keeping cables operational in harsh environments such as jet engines and nuclear fission reactors have been understood for a long time, [...]

    Read more

  • Assembly preparation | Off goes the lid

    In the summer of 2017, a circular platform was installed inside of the large steel-and-concrete cylinder of the Tokamak pit. The 200-tonne structure was meant t [...]

    Read more

  • Deliveries | Two coils on their way

    For the past five years, 'highly exceptional loads' (HEL) have been successfully travelling along the ITER Itinerary to be delivered to the ITER site. As the pr [...]

    Read more

  • ITER NOW video | Ready for the big lifts

    This new video in our "ITER NOW" series provides an insider's view of the recent load tests performed as the ITER Organization prepares for the machin [...]

    Read more

  • Divertor | Far more than a fancy ashtray

    It has been likened to the filter of a swimming pool or an oversized ashtray. It has been called alien in shape and hellish in its affinity for heat. But whatev [...]

    Read more

Of Interest

See archived entries

A GÉANT on the fusion data highway

Fusion for Energy

GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO. (Click to view larger version...)
GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO.
Since the ninth of April, GÉANT, the world's leading high-speed research and education network managed and operated by DANTE in Cambridge, UK, has been providing data links to the International Fusion Energy Research Centre (IFERC) in Rokkasho, Japan.

IFERC hosts the Helios supercomputer, a system with a compute power exceeding 1 PFlops attached to a storage capacity of 50 PB. The Helios supercomputer is provided and operated by the French Alternative Energies and Atomic Energy Commission (CEA) and is a European Domestic Agency resource.

GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO, the demonstration fusion reactor considered as the follow-up to ITER.

It is hoped that, after the first fusion plasmas of ITER planned for 2020 and beyond, DEMO, an industrial demonstration fusion reactor, will lead to full-scale fusion energy reaching the commercial market in the second half of this century.

Read more on the European Domestic Agency website.


return to the latest published articles