Subscribe options

Select your newsletters:


Please enter your email address:

@

News & Media

Latest ITER Newsline

  • Cryoplant | Filled from floor to ceiling

    The ITER cryoplant used to be a vast echoey chamber with 5,400 m² of interior space divided into two areas; now, it is filled from floor to ceiling with industr [...]

    Read more

  • Cryostat | Adjusting, welding, testing ...

    The assembly of the ITER cryostat—the stainless steel "thermos" that insulates the ultra-cold superconducting magnets from the environment—is progress [...]

    Read more

  • Tokamak Building | Full steam ahead

    In this central arena of the construction site, construction teams are active three shifts a day—two full work shifts and a third, at night, dedicated to moving [...]

    Read more

  • Poloidal field coils | Turning tables and hot resin

    One of only two manufacturing facilities located on the ITER site, the Poloidal Field Coils Winding Facility was constructed by Europe to house the winding, imp [...]

    Read more

  • Assembly Hall | One giant standing

    Two identical handling tools in the Assembly Hall will play a critical role in preparing ITER's nine vacuum vessel sectors for their final journey: transport by [...]

    Read more

Of Interest

See archived entries

A GÉANT on the fusion data highway

Fusion for Energy

GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO. (Click to view larger version...)
GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO.
Since the ninth of April, GÉANT, the world's leading high-speed research and education network managed and operated by DANTE in Cambridge, UK, has been providing data links to the International Fusion Energy Research Centre (IFERC) in Rokkasho, Japan.

IFERC hosts the Helios supercomputer, a system with a compute power exceeding 1 PFlops attached to a storage capacity of 50 PB. The Helios supercomputer is provided and operated by the French Alternative Energies and Atomic Energy Commission (CEA) and is a European Domestic Agency resource.

GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO, the demonstration fusion reactor considered as the follow-up to ITER.

It is hoped that, after the first fusion plasmas of ITER planned for 2020 and beyond, DEMO, an industrial demonstration fusion reactor, will lead to full-scale fusion energy reaching the commercial market in the second half of this century.

Read more on the European Domestic Agency website.


return to the latest published articles