Subscribe options

Select your newsletters:


Please enter your email address:

@

News & Media

Latest ITER Newsline

  • A world in itself

    From a height of some 50 metres, you have the entire ITER worksite at your feet. The long rectangle of the Diagnostics Building stands out in the centre, with [...]

    Read more

  • US completes toroidal field deliveries for ITER

    The US Domestic Agency achieved a major milestone in February by completing the delivery of all US-supplied toroidal field conductor to the European toroidal fi [...]

    Read more

  • Thin diagnostic coils to be fitted into giant magnets

    Last week was marked by the first delivery of diagnostic components—Continuous External Rogowski (CER) coils—from the European Domestic Agency to the ITER Organ [...]

    Read more

  • Addressing the challenge of plasma disruptions

    Plasma disruptions are fast events in tokamak plasmas that lead to the complete loss of the thermal and magnetic energy stored in the plasma. The plasma control [...]

    Read more

  • Blending (almost) seamlessly into the landscape

    Located in the foothills of the French Pre-Alps, the ITER installation blends almost seamlessly into the landscape. The architects' choice ofmirror-like steel c [...]

    Read more

Of Interest

See archived articles

A GÉANT on the fusion data highway

-Fusion for Energy

GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO. (Click to view larger version...)
GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO.
Since the ninth of April, GÉANT, the world's leading high-speed research and education network managed and operated by DANTE in Cambridge, UK, has been providing data links to the International Fusion Energy Research Centre (IFERC) in Rokkasho, Japan.

IFERC hosts the Helios supercomputer, a system with a compute power exceeding 1 PFlops attached to a storage capacity of 50 PB. The Helios supercomputer is provided and operated by the French Alternative Energies and Atomic Energy Commission (CEA) and is a European Domestic Agency resource.

GÉANT is supplying a 10 Gbps (10 Gigabits per second) link to connect Helios with scientists involved in ITER and DEMO, the demonstration fusion reactor considered as the follow-up to ITER.

It is hoped that, after the first fusion plasmas of ITER planned for 2020 and beyond, DEMO, an industrial demonstration fusion reactor, will lead to full-scale fusion energy reaching the commercial market in the second half of this century.

Read more on the European Domestic Agency website.


return to the latest published articles