More than 300 videos are available through the ITER video library below. Use the drop down list to select the category that interests you or select All Videos and search by key word. The video page opens by default to What is ITER?—a selection of introductory videos to the ITER project.

4:28
6 JUL 2020
MANUFACTURING AND TRANSPORT

Last leg of the journey for poloidal field coil #6

0:41
25 JUN 2020
MACHINE ASSEMBLY

Sector sub-assembly tools in action

6:38
23 JUN 2020
WHAT IS ITER?

Four Domain Heads, one single goal

3:08
22 JUN 2020
DRONE VIDEOS

ITER by drone - June 2020

0:28
9 JUN 2020
STOCK SHOTS

Cryostat base lift animation (Brigantium Engineering)

0:28
8 JUN 2020
NEWSLINE (UN-CATEGORIZED)

4D BASE_LIFT

00:28
5 JUN 2020
MACHINE ASSEMBLY

4D: Cryostat base lift

2:19
5 JUN 2020
IN THE MEDIA

Saint Paul Lez Durance : Le Tokamak d'Iter se construit pas à pas (ALTO Dici Radio)

2:15
3 JUN 2020
WHAT IS ITER?

What is fusion? How can it change our future? (Fusion for Energy)

2:06
2 JUN 2020
SITE CONSTRUCTION

A 56-tonne "helium dryer" installed in the ITER cryoplant

2:12
2 JUN 2020
MACHINE ASSEMBLY

First machine component installed

4:12
29 MAY 2020
ITER NOW

ITER NOW 1.11: The Big Lift

28:52
18 MAY 2020
IN THE MEDIA

Fusion: Making an artificial sun (CGTN)

8:01
4 MAY 2020
ITER NOW

ITER NOW 1.10: Toroidal field coils

2:26
27 APR 2020
EVENTS

Ceremony: first vacuum vessel sector in Korea

7:25
27 APR 2020
MANUFACTURING AND TRANSPORT

The story of vacuum vessel sector #6

2:04
21 APR 2020
ITER NOW

ITER NOW 1.9: ITER on the move

4:38
7 APR 2020
ITER NOW

ITER NOW 1.8: Preparing for the Big Lifts