"A Preliminary Design Review for the AC/DC magnet power converters was held exactly
one year ago, part of the Procurement Arrangement signed by the Korean Domestic Agency in
March 2011. The scope of the Procurement Arrangement includes the detailed design of the AC/DC power converter units for the ITER correction coils and vertical stabilization coils. During the preliminary review, interface requirements were clarified, key electrical design parameters were carefully evaluated, factory acceptance test (FAT) items were fully discussed, and site installation procedures and tooling were well investigated. This month, after one year of hard work, everything was ready for the Final Design Review for the correction coil and vertical stabilization power converters. (The Final Design Review of the central solenoid and toroidal field coil power converters is planned for the end of this year).
The new design review procedure applied to the Final Design Review was a challenge for the joint team composed and the industry consortium comprising Dawonsys and Hyosung. Led by Hao Tan, all parties have been working closely together since March when the interface review meeting was finished. Within 80 days, an internal Final Design Review was organized by the Korean Domestic Agency in order to ensure success during the ITER review. The ITER Organization technical team reviewed all of the review documentation in advance before its official submission to make sure all the key points of the design were presented clearly and precisely.