A detailed work plan was officially presented by the Chinese Test Blanket System team during the kick-off meeting, chaired by the Chinese TBM Leader Chuanhong Pan and held in presence of the head of the Chinese Domestic Agency, Luo Delong, of representatives of the ITER Organization, and of experts from the three main Chinese institutes involved in the Test Blanket System development program: the Southwestern Institute of Physics (SWIP, Chengdu), the Chinese Academy of Engineering Physics (CAEP, Chengdu) and the Institute of Nuclear Safety Energy Technology (INEST, Hefei).
The work plan details the preliminary and final design phases (and the necessary R&D) for the various sub-systems and components of the HCCB-TBS such as the helium-cooling system, the tritium extraction system, the tritium accountancy system, and instrumentation and control. Participants at the meeting also discussed the required studies concerning safety and integration, and the design of a number of components that will be common to the two systems located in the same ITER equatorial port: the Chinese HCCB-TBS and Test Blanket System procured by India (the Lithium-Lead Ceramic Breeder, or LLCB-TBS).
Everything is now in place for the preliminary and final design activities to be performed for the Chinese Test Blanket System.