As is often the case with ITER components, the techniques involved alternate between the most sophisticated technologies (like laser tracking) and the most basic tools — manual screw jacks, chain slings and winches that will be used to correct the segment profiles and achieve the required sub-millimetre precision.
Once the long and complex alignment operations are finalized, welding will begin. The six 5-metre-high weld gaps between the segments will be filled and tier one of the cryostat lower cylinder will be complete.
Similar operations will be performed on tier two, whose six sectors are due to leave India in mid-September.
Once the lower cylinder segment is complete (tier one and tier two), it will be encased in an airtight cocoon and, pending assembly, stored in a dedicated area adjacent to the Cryostat Workshop.