KSTAR was significantly upgraded following the second operation campaign and in preparation for the third. All the plasma-facing components are now installed inside the vacuum vessel, as are the sixteen segmented in-vessel control coils that are positioned behind the plasma-facing components.
During the upcoming campaign, the first of three ion sources in the neutral beam injection system, designed to deliver 8 MW, will be commissioned to provide 1 MW beam power.
The neutral beam injector system has been designed to deliver the deuterium beam for 300 seconds.