Plot 7 is a special section of the concrete fortress that surrounds the machine: it is where the
large openings for the neutral beam injectors (and their curious ovoid penetrations) are located.
The operation, which lasted for the better part of the day, consisted in pouring some 240 cubic metres of self-compacting concrete through dense rebar in order to form a wall 5.4 metres high.