Désolé, cette page n'existe pas en français.
In this new photomontage by General Atomics and US ITER, watch how ITER's 1,000-tonne central electromagnet is fabricated in a specialized workshop in Poway, California. It takes approximately 22-24 months to manufacture one central solenoid module, and six are needed for the ITER machine (plus a seventh as a spare). © General Atomics/US ITER
Click here to see the video.