Enable Recite

Subscribe options

Select your newsletters:

Please enter your email address:

@

Your email address will only be used for the purpose of sending you the ITER Organization publication(s) that you have requested. ITER Organization will not transfer your email address or other personal data to any other party or use it for commercial purposes.

If you change your mind, you can easily unsubscribe by clicking the unsubscribe option at the bottom of an email you've received from ITER Organization.

For more information, see our Privacy policy.

News & Media

Latest ITER Newsline

  • Cryolines | Out through the door, in through the roof

    Cooling fluids for the machine's magnets, thermal shield and cryopumps will travel to the Tokamak Building through a set of large multi-process pipes (cryolines [...]

    Read more

  • Image of the week | Next in line

    Of six ring-shaped coils required for the ITER Tokamak, poloidal field coil #6 (PF6) is the heaviest (400 tonnes) and the second smallest, with a diameter of 10 [...]

    Read more

  • Assembly tools | Strong base for a very heavy task

    The first part of the in-pit assembly tool has been installed in the Tokamak pit. When complete, the tool will stand more than 20 metres high and branch out in [...]

    Read more

  • Diagnostics | A stowaway on board toroidal field coil #8

    Hidden inside the steel case of the most recent toroidal field coil delivered to ITER—TF8, from Japan—is a unique and critical diagnostic device. Named after th [...]

    Read more

  • Vacuum vessel sector | A 90° tilt in mid-air

    Ever since ITER entered the machine assembly phase, some ten months ago, we have been treated to a few spectacular lifting operations. In May 2020, we watched t [...]

    Read more

Of Interest

See archived entries

Control system: one tier out of three

Standing next to DG Motojima: Antonio Gonzàlez, senior vice-president, Empresarios Agrupados S.A.; Felipe Collado, director, Instalaciones Inabensa S.A.; Maria-Teresa Domìnguez, Advanced Projects Director, Empresarios Agrupados S.A. and Juan Pérez-Tinao, Business Development, Instalaciones Inabensa S.A. (Click to view larger version...)
Standing next to DG Motojima: Antonio Gonzàlez, senior vice-president, Empresarios Agrupados S.A.; Felipe Collado, director, Instalaciones Inabensa S.A.; Maria-Teresa Domìnguez, Advanced Projects Director, Empresarios Agrupados S.A. and Juan Pérez-Tinao, Business Development, Instalaciones Inabensa S.A.
On Monday 10 June, ahead of schedule, a contract was signed between the ITER Organization and the Spanish consortium comprising Empresarios Agrupados and Inabensa for the detailed design, qualification and supply of the Central Safety System-Nuclear (CSS-N) for First Plasma.

The safety control system is one of the three tiers in the ITER control system, the others being the interlock control system for investment protection and the conventional control system for operation. The safety control system is split into occupational and nuclear safety and is the personnel and environment protection system of ITER. The nuclear safety control system is subject to licensing by the French nuclear regulatory authority (ASN).

The selection and qualification of the technology based on hardwired logic involved in the implementation of nuclear safety I&C functions of the highest category—another one of the highlights of this contract.


return to the latest published articles