Reference |
Title |
Tender Process |
Current Step |
IO/22/CFE/10023565/CPT |
new
Port Plugs Mechanical Instrumentation design and qualification, and Tokamak Systems Monitor interfacing sensors specification
|
Call for Expertise
CallforExpertise_tender
|
Call for Expertise
Status :
Ongoing |
IO/22/CFE/10023505/CPT |
updated
Diagnostic Data Management and Coordination
|
Call for Expertise
CallforExpertise_tender
|
Call for Expertise
Status :
Ongoing |
IO/22/CFE/10023489/BBE |
Mechanical engineering expert for the FDR (Final Design Review) of the DMS (Disruption Mitigation System) design
|
Call for Expertise
CallforExpertise_tender
|
Call for Expertise
Status :
Ongoing |
IO/22/CFE/10023295/CPT |
Diagnostic Expert Support for 55.G8 Erosion Deposition Monitor
|
Call for Expertise
CallforExpertise_tender
|
Call for Expertise
Status :
Closed |
IO/22/CFE/10023293/CPT |
Specialist work relating to Thomson Scattering Oversight
|
Call for Expertise
CallforExpertise_tender
|
Call for Expertise
Status :
Closed |
IO/22/CFE/10023281/ADC |
updated
Senior Mechanical Designer for Preparation of In-Vessel Assembly tender and contract mobilisation
|
|
Awarded
Status :
Closed |
IO/22/CFE/10023184/BBE |
Project Integration of 55 BT Neutron Facility and Neutron diagnostics
|
Call for Expertise
CallforExpertise_tender
|
Call for Expertise
Status :
Closed |
IO/22/CFE/10023127/CPT |
updated
Expert support to Heat and Imaging Instrumentation
|
|
Awarded
Status :
Closed |
IO/22/CFE/10022735/BBE |
updated
Expert engineer for review and development of diagnostic mechanical designs
|
|
Awarded
Status :
Closed |
IO/22/CFE/10022908/ADC |
Senior Mechanical Engineer to support in-vessel assembly tenders and preparation for contract mobilisation.
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022615/KJT |
Common Engineering Support for Equatorial Port #08 and #17 with Disruption Mitigation System
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022407/CPT |
Thermal-Hydraulic Analysis and Structural Assessment of Equatorial Port #17 Port Plug with Integrated Disruption Mitigation System and Diagnostics
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022610/CPT |
Detailed thermal and structural design of 6 Diagnostic First Walls
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022599/KJT |
Diagnostic Interface Engineering
|
Cancelled
Cancelled_tender
|
Cancelled
Status :
Closed |
IO/21/CFE/10022621/KJT |
Expert support for the DMS Cryogenics engineering and integration expert activities
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022590/INU |
Support for Propellant Modelling of Disruption Mitigation System
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022338/INU |
updated
Engineering support of LEVI design development and manufacturing for ports with DMS
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022394/INU |
Mechanical engineering support for the disruption mitigation system design focusing on in-vessel design
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022395/INU |
Technical administration support for the disruption mitigation system design
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022097RP3/EBT |
Integration Coordination Expert for the Holistic Integration Team/RP3
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022097RP2/EBT |
Integration Engineering Expert for the Holistic Integration Team/RP2
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022217/CPT |
VUV and XRay diagnostics management
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022239/CPT |
Expert analysis support for the justification of structural integrity and production of related EWP documentation of diagnostic in-vessel systems
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022201/BBE |
Lower Port Pipe RH Operations Engineering
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021344/INU |
Maintenance of port-based diagnostic systems with DMS
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022121/CPT |
Analysis and structural justification of the supports in the building
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022031/CPT |
Specialist Engineering work for the Fibre Optic Current Sensor installation and design
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022137/CPT |
Support for the building integration
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022062/CPT |
In-Vessel & In-Divertor Electrical Services Design Finalisation and Manufacturing Monitoring
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021997/INU |
Engineering Analysis support for the disruption mitigation system design
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021927/INU |
Continued Integration engineering support for the 55.E5
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021861/INU |
Tenants mechanical interfaces development for EQ#08 and EQ#17
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021654/INU |
Specialist work relating to the final design of Port Plugs handling features and insertion / extraction procedures
|
|
Awarded
Status :
Closed |
IO/21/CFE/10022002/CPT |
Analysis that assists the diagnostic designs and requirements
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021928/INU |
Interface & Documentation support for the Disruption Mitigation System Design
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021587/KRH |
Expert Support for Diagnostics I&C Integration
|
|
Awarded
Status :
Closed |
IO/21/CFE/10021344/INU |
Maintenance of port-based diagnostic systems with DMS
|
|
Awarded
Status :
Closed |
IO/20/CFE/10018635/MBA |
Senior Engineer for TF Structure and Coil Manufacture Follow-up
|
|
Awarded
Status :
Closed |
IO/19/CFE/18393/NMX |
Administration of the Manufacturing Database for Magnet Components
|
|
Awarded
Status :
Closed |