The system will be the largest ever built, far exceeding prior installations at TFTR, JET, and JT-60 in terms of power and energy. In-kind contributions are made by China and Korea for the AC/DC converters, the reactive power compensation and the AC distribution. The Russian Domestic Agency supplies the switching networks and the fast discharge units.
While many chits were generated, the general opinion of the review committee was that the conceptual design has been well established and that the next phase of the work, the preparation of Procurement Arrangements, can proceed.