In his address to the small audience, Director-General Bigot stressed its importance in the successful realization of the crown—a challenging structure characterized by unique geometry, high-density steel reinforcement and high-performance concrete.
The crown was successfully finalized last autumn, and the mockup's mission has been fulfilled. Because space on the ITER platform is always scarce it may one day be demolished. In the meantime, it deserved to be honoured for its significant contribution to the project.
¹Tiresia, Energhia, Nuvia, and APAVE (heath and safety).