On the north side of the work site, two of the five levels of pillar are already in place. Work has just begun on the third level (one third-level pillar is visible in the photo).
Le chantier d'excavation du Complexe Tokamak vu du ciel au mois de décembre 2010. Photo : Altivue/AIF