The Procurement Arrangement is based on functional specifications describing the technical requirements of the system; the challenge now is to jointly develop the detailed design. "The meeting was very successful and efficient," said Ashok Mankani, Power Converter Project Engineer. "It should be considered a good start on the road to developing a better understanding of the scope of this Procurement Arrangement, the interfaces and the next milestones that have to be achieved."
The AC/DC converters components are essential for supplying DC power to ITER's poloidal field coil circuits with the operating requirements of 55 kA and 1.35 kV to 4 kV. The large capacity of 3x250 Mvar reactive power at 66 kV is essential for the stability and performance of ITER's power system.