Lettres d'information

Choisissez ce que vous souhaitez recevoir :

Merci de renseigner votre adresse de messagerie électronique :

@

Votre adresse email ne sera utilisée que dans le cadre de campagnes d'information ITER Organization auxquelles vous êtes abonné. ITER Organization ne communiquera jamais votre adresse email et autres informations personnelles à quiconque ou dans le cadre d'informations commerciales.

Si vous changez d'avis, il vous est possible de vous désinscrire en cliquant sur le lien 'unsubscribe' visible dans vos emails provenant d'ITER Organization.

Pour plus d'information, veuillez consulter notre Politique de confidentialité.

Actu & Médias


Pour les actualités en français, voir la page Actus & Médias.

Strip off the concrete

Big city lights or fusion facility? This illustration shows the openings and penetrations implemented in the Tokamak Complex buildings configuration model (2010). (Click to view larger version...)
Big city lights or fusion facility? This illustration shows the openings and penetrations implemented in the Tokamak Complex buildings configuration model (2010).
As an example of a typical auxiliary building CMM, here is the model of Site Services Building 61—with all the walls hidden to show the plant systems inside the building. (Click to view larger version...)
As an example of a typical auxiliary building CMM, here is the model of Site Services Building 61—with all the walls hidden to show the plant systems inside the building.
What an unattractive expression for something that is almost artistic: a configuration management model (CMM) describes the required space envelope needed by a system or component taking into account space for maintenance, assembly, inspection and the interfaces with other systems and the buildings.

Recently, significant progress was made by the System Engineering Support team led by Thibault Tsedri in collecting and defining approximately 800 required openings and penetrations in the walls and floor slabs in the Tokamak Complex buildings.

The completion of all the models was a necessary part of confirming that the size and layout of each building is adequate and appropriate for the accommodation of all plant systems. CMMs will also provide the Architect Engineering (AE) contractor with all the necessary information to start the preliminary design of the buildings.

The ultimate milestone will be the signature of the AE contract that will take place on the ITER site next Tuesday, 13 April.



return to the latest published articles