Lettres d'information

Choisissez ce que vous souhaitez recevoir :

Merci de renseigner votre adresse de messagerie électronique :

@

Votre adresse email ne sera utilisée que dans le cadre de campagnes d'information ITER Organization auxquelles vous êtes abonné. ITER Organization ne communiquera jamais votre adresse email et autres informations personnelles à quiconque ou dans le cadre d'informations commerciales.

Si vous changez d'avis, il vous est possible de vous désinscrire en cliquant sur le lien 'unsubscribe' visible dans vos emails provenant d'ITER Organization.

Pour plus d'information, veuillez consulter notre Politique de confidentialité.

Actu & Médias

Links

Of Interest

See archived articles

Conferences


Pour les actualités en français, voir la page Actus & Médias.

Japanese company produces first strands for ITER toroidal field conductors

Hitachi Cables Quality Assurance officers measuring the strand diameter after delivery from Jastec. (Click to view larger version...)
Hitachi Cables Quality Assurance officers measuring the strand diameter after delivery from Jastec.
The first small step: the box contains two spools of Nb3Sn strand representing a value of around $30,000. The Japanese Domestic Agency Responsible Technical Officer, Y. Takahashi, stands in front. (Click to view larger version...)
The first small step: the box contains two spools of Nb3Sn strand representing a value of around $30,000. The Japanese Domestic Agency Responsible Technical Officer, Y. Takahashi, stands in front.
ITER Organization presents the Japanese Domestic Agency and Hitachi with an award for their performance (two bottles of champagne to represent the ITER site and a bottle of Sake to represent the source of the material). (Click to view larger version...)
ITER Organization presents the Japanese Domestic Agency and Hitachi with an award for their performance (two bottles of champagne to represent the ITER site and a bottle of Sake to represent the source of the material).
The first 50 kg of chrome-plated niobium-tin (Nb3Sn) strands for the ITER toroidal field magnet conductor have been delivered for cabling. In total, the ITER toroidal field coils will require about 400 tonnes of Nb3Sn strands, whose production will be shared among six ITER Members: China, Europe, Japan, Korea, Russia and the US. This delivery represents a very small first step (0.01 percent of the supply) on the road to construction, but it is the first completed component that will form a part of the future Tokamak.

On 28 November 2007, the Japanese Domestic Agency was the first to sign a Procurement Arrangement with the ITER Organization covering its 25 percent share of cable-in-conduit conductors for the toroidal field magnet system. In March 2008, the Japanese Domestic Agency awarded two contracts to Japanese companies for the supply of 20 tonnes each of chromium-plated Nb3Sn strands within the framework of this Procurement Arrangement. One of the companies, Jastec, completed the production of its first batch of strands in mid-December 2008 and carried out the required acceptance tests earlier this year.

Following the successful completion of these tests, Jastec received the required 'authorization to proceed' from the Japanese Domestic Agency, and was cleared to ship the strands to the cable manufacturer. All corresponding strand data was saved to the Conductor Database, developed by the ITER Organization as a common tool to assist the Domestic Agencies in monitoring their industrial contracts.


return to Newsline #73