The lower cylinder of the cryostat—30 metres in diameter, 490 tonnes—has been completely assembled. During the welding operations of the last months, approximately 200 metres of circular and vertical welds were carried out. When all activities on this cryostat section conclude, it will be moved from the Cryostat Workshop to a protected location on the platform to make room for the upper cylinder segments that will be arriving from India.