Subscribe options

Select your newsletters:

Please enter your email address:

@

News & Media

Latest ITER Newsline

  • FEC2020 | Seeking sponsors for 28th IAEA Fusion Energy Conference

    For only the third time since 1961, the International Atomic Energy Agency's Fusion Energy Conference will be taking place in France—hosted jointly by the Frenc [...]

    Read more

  • Nuclear safety | Under constant scrutiny

    Because one of the elements involved in the fusion reaction is the radioactive isotope tritium, and because the hydrogen fusion reaction itself generates a high [...]

    Read more

  • Power conversion | Alien structures and strange contraptions

    There are places in ITER that seem to belong to another world, places full of alien structures and strange contraptions. The feeling—a mixture of awe and puzzle [...]

    Read more

  • Tokamak Complex | A changing landscape

    For the past three years, the view from the top of the highest worksite crane has not changed much. Inside of the Tokamak Complex, 80 metres below, concrete gal [...]

    Read more

  • Ion cyclotron heating | How to pump 20 MW of power into 1 gram of plasma

    To power the ion cyclotron system, the ITER Organization and its partners are designing not only new antennas, which will be housed in the tokamak vessel, but a [...]

    Read more

Of Interest

See archived entries

Russia concludes qualification of TF conductor

Alexander Petrov, ITER Russia

Good news from Moscow: The qualification of the manufacturing process for the toroidal field conductor was successfully concluded. Following the manufacture of 760 metres of toroidal field copper dummy conductor in August, the full-scale dummy was tested successfully on 20-21 September at the NRC Kurchatov Institute.

In the presence of a representative from the European Domestic Agency, the full-scale copper dummy successfully passed the global leak test, the hydrostatic pressure test, and the pressure drop test. The dummy conductor was then extracted from the vacuum vessel and prepared for transportation to Italy, where it will be tested and qualified.

These positive results show the readiness of the Russian industry (manufacturers JSC TVEL and JSC VNIIKP) to produce the conductors on industrial basis.



Click here to view the video...



Many more videos are available on the ITER video page...

return to the latest published articles