Subscribe options

Select your newsletters:

Please enter your email address:

@

Your email address will only be used for the purpose of sending you the ITER Organization publication(s) that you have requested. ITER Organization will not transfer your email address or other personal data to any other party or use it for commercial purposes.

If you change your mind, you can easily unsubscribe by clicking the unsubscribe option at the bottom of an email you've received from ITER Organization.

For more information, see our Privacy policy.

News & Media

Also in this issue

  • ITER Members are involved broadly in the in-kind procurement for ITER, sharing responsibility for the fabrication of components and systems. Participating in ITER also means reinforcing the scientific, technological and industrial base in fusion back at home. (Note: not all components and contributions could be reproduced here.)

    The world's largest Erector Set

    Compared to the ITER Tokamak, a space shuttle, an aircraft carrier and a nuclear submarine are all relatively simple objects: their technologies are well teste [...]

    Read more

  • The "simplified models" that Lauris Honoré creates from the huge ITER data bank are terrific pedagogical and communication tools, revealing what the installation is really like, in all its beauty and complexity.

    A jewel in its concrete box

    Deep into the ITER servers lays the huge data bank, constantly updated, that forms the 3D blueprint of the whole installation. Digging into this "detailed [...]

    Read more

  • José Manuel Barroso, the President of the European Commission,  is convinced that the future of Europe is in science and innovation. On 11 July 2014, he visited ITER to reaffirm Europe's commitment to ITER.

    Europe's Barroso: "Proud to have believed in ITER"

    In the official photo of the ITER Agreement—signed at the Elysée Palace in Paris on 21 November 2006—he occupies the place of honour at French President Jacque [...]

    Read more

  • The European tokamak JET, enhanced with an ITER-like wall and divertor, is getting ready to renew experiments with a 50-50 mix of deuterium and tritium.

    T-time for JET

    In operational tokamaks around the world, plasmas are heated every day to temperatures that reach tens of thousands, or even millions, of degrees Celsius. Run [...]

    Read more

Mag Archives

A concrete for every purpose

The concrete employed at ITER plays a double role—guaranteeing structural integrity as well as nuclear safety. Whether its formulation is ordinary or exceptional, the concrete is the object of control and verification at each stage of its elaboration and implementation. (Click to view larger version...)
The concrete employed at ITER plays a double role—guaranteeing structural integrity as well as nuclear safety. Whether its formulation is ordinary or exceptional, the concrete is the object of control and verification at each stage of its elaboration and implementation.
Gravel, sand, cement, water and sometimes an additive ... at first glance, concrete seems like a simple material. But not at ITER, where construction follows strict norms and regulations, and every step is verified not once ... but many times.

Two 1.5-metre-thick concrete basemats are already in place in the Tokamak Seismic Pit. For the lower basemat, which supports the 493 anti-seismic columns, a rather "standard" concrete was chosen that has a resistance to compression of approximately 3,000 tons per square metre.

For the upper level basemat—the "floor" that will support the machine and the Tokamak Complex buildings—superior resistance is called for (4,000 tons per square metre) as well as particular qualities related to nuclear confinement as it must act as the ultimate confinement barrier after the vacuum vessel walls and the 3.5-metre thick bioshield.

Strongest of all is the concrete for the crown-shaped pedestal of the 23,000-ton ITER Tokamak, which is required to have a degree of resistance two to three times that of the Tokamak Complex floor. (This particular formula is still undergoing qualification activities.)

And finally in the immediate proximity of the Tokamak (the bioshield, for example), contractors will employ "heavy concrete," where the typical granular materials are replaced by iron ore. For this concrete, the mass of one cubic metre increases from 2.4 to 3.6 tons.

Whether ordinary or exceptional, the concrete used in ITER construction is the object of control and verification at each stage of its elaboration and implementation. All concrete formulas are tested by the contractor in charge of concrete pouring, both in the laboratory and in real-scale mockups.

No summer break for ITER construction! On 29 July, workers poured one of the central segments of the Tokamak Complex basemat. (Click to view larger version...)
No summer break for ITER construction! On 29 July, workers poured one of the central segments of the Tokamak Complex basemat.
Consistency and spreadability are also important parameters in order to ensure the homogenous distribution of the concrete throughout tight matrixes of steel reinforcement. These parameters are tested as the concrete leaves the on-site batching plant and before it gets loaded into the mixer trucks.

For each realization on the worksite, samples are taken and stored in order to study the evolution of the concrete over the short and long term (2 to 90 days). "We rely on systematic verification and testing," say Damien Sorbier and Romain Paix, both engineers with the Engage consortium, in charge of detailed design and work supervision for the European Domestic Agency. "But everything is well prepared ahead of time so that we don't have any surprises..."

On pouring days, operators must also keep a close eye on ambient temperature. The concrete can't leave the batching plant if the thermometer displays a temperature of 10°C or lower; pouring is also cancelled if temperatures exceed 30°C. Mid-winter or mid-summer, the concrete is sometimes warmed or cooled to remain within acceptable parameters.

No effort is too great to ensure the quality of the concrete and its implementation because for ITER, this will determine the integrity and the safety of the entire installation.